Different decisions need different briefs.

A condition review records the existing installation. A repair investigation focuses on a reported problem. A modernisation assessment considers options and the equipment that may be retained.

A pre-contract assessment helps define the starting condition and proposed cover. These are different purposes, even when some observations overlap.

Make the output useful for your project.

Tell us whether you need findings, a work proposal or information to share with an appointed consultant. Agree what the report will contain and whether pricing is part of the commission.

For a planned upgrade, discuss downtime, access, building works and interfaces with other contractors. Recommendations should distinguish the observed problem from an optional improvement.

Avoid gaps between appointments.

A survey does not automatically include testing, design, building works or a thorough examination. Record the agreed inclusions and exclusions before attendance.

Forge can discuss modernisation and repair work from the findings. If independent project advice is needed, our consultant guide explains that separate role.

Start with your installation

What to send us.

  • The decision, budget constraints and desired timing.
  • Reports and drawings already available.
  • Whether another consultant, contractor or examiner is involved.

Existing reports and photos taken from safe, accessible areas can help. We’ll confirm the assessment or work needed for your site.

Related support